Stormwater pipework before paving
Perth, Western AustraliaFor stormwater pipework before paving, coordinate downpipe connections, crossings and levels. Treat the pipe route as a scheduled part of the build.

Mark levels and crossings
Place finished levels, pipe crossings and known services on the current drawing. Review the routes where a line passes close to site structures or where the next contractor needs the same working space.
If the driveway is poured before the underground crossing is settled, even a simple change can require cutting a finished surface. Show where each new downpipe enters the planned route and what remains to be connected later.
What to check at the property
Approved outlet: price the entire connection
Ask the contractor to state the inlet locations, proposed access points and destination. Keep any approved outlet conditions with the drawing. A pipe that disappears from the sketch leaves a question about where the water actually goes.
Related soakwell and drainage guides
Property records: leave a readable record
Identify the branches in the open-trench photos and match them to the final plan. Keep the sheet with the property records for future paving and garden work.

Stormwater pipework before paving: practical checks
As-built drawing: what if an underground crossing has to be moved after work starts?
Set a pause point so the responsible provider can compare the new route with service locations, levels and the next trade’s work. Record the revision before burial. Ask for the updated position and final connection point on the same as-built drawing.

Get the details together
Use the enquiry form to see which details help describe the site and the work.
Frequently asked questions
Can the last downpipe be connected after handover?
Confirm who is responsible, what temporary protection is appropriate and how the completed connection will be checked and documented.
Who needs to see the pipe route before a driveway is poured?
Share the current drawing with the person responsible for drainage and the person setting driveway levels. Agree when to record the open work.
How can two stormwater trades avoid a gap at a downpipe connection?
Put the handover point on the current roof and ground drainage drawings and assign the final connection to one party. Agree how any temporary arrangement will be checked. Ask for the completed connection to be photographed or recorded before landscaping makes it hard to see.
Where should I mark a stormwater pipe crossing on the plan?
Mark the crossing on the stormwater plan wherever pipework meets a driveway, footing or another service. Use the current site drawings and label any crossing that still needs to be verified. Give the updated plan to the trade that will cover the route.
What should I ask before an old stormwater outlet is reused?
Ask the installer to identify the old stormwater outlet, trace where it goes and record how its condition will be checked. Show the outlets served by the new pipework on the same drawing. Compare the proposed reuse against the actual site information before the route is covered.