Perth, Western AustraliaSoakwell and stormwater guides
Soakwell InstallationPERTH

Soakwell relocation before construction

Perth, Western Australia

For soakwell relocation before construction, plan the old and new connections before excavating. Moving a soakwell changes more than its location.

Square drainage grate fitted into brick paving
Perth property guidesSite planningStormwater drainageSoakwell options

Request a FREE quote

Form preview · online enquiries are not open yet.

Temporary drainage: check the existing branches

Compare plans with visible covers and downpipes and have uncertain branches traced. Identify any temporary drainage arrangement needed during the build rather than leaving an active pipe cut off.

Record what sends water to the old chamber and what will serve those connections once the extension or pool trench is open. The final drainage layout should make sense with the new footprint and levels.

What to check at the property

  • Put the new and old route on one plan

    Label what remains, what is removed and who provides the new outlet. Give that plan to both excavation and building contractors so their scopes do not assume different end points.

  • Hand over the drainage system in stages

    Mark the branch that continues to take roof water on a stage drawing of the drainage system. Have the responsible trades agree when the new connection can be used before the excavator closes off the old route.

Related soakwell and drainage guides

Soakwell replacement before repaving

Mini excavator wet hire for soakwell work

Soakwell installation for a patio extension

Pool drainage planning before excavation

Soakwell installation before paving

Concrete soakwells for driveways

Polypropylene soakwells for tight access

Soakwell repairs during renovation

Paved area: confirm the handover surface

Ask what will be removed and what will be left underground. Record ground reinstatement and any work required before the next footing or paved area can be constructed.

Compact excavator near a trench in a narrow side yard

Soakwell relocation before construction: practical checks

Who owns runoff while the old chamber is being relocated?

Put a temporary stage on the plan if the new chamber will not be ready when excavation begins. Assign the live branches and temporary arrangements to the responsible provider. Record when they can be switched over and what check confirms the new route is ready.

Compact excavator beside a soakwell excavation on a residential lot

Get the details together

Use the enquiry form to see which details help describe the site and the work.

View enquiry formQuote checklist
Planning a quotePrepare your site details

Frequently asked questions

When should the old chamber come out?

After the replacement route and work sequence are agreed, with the responsible contractor checking which connections can be taken out of use and when.

What details should go on a soakwell relocation work order?

Show the old chamber, active branches, proposed new position and which connections stay live during the works. Assign responsibility for closing or removing the old parts and reinstating the area. Include who approves a change if a planned crossing or excavation is not possible.

Which connections should be marked before a soakwell is relocated?

Mark each confirmed inlet and outlet on the relocation drawing, then label any pipe whose destination is unknown. Show which part of the route is temporary and who checks the new connection. Keep the final drawing after the old chamber and pipework are covered or removed.

Can the next building trade start as soon as the old soakwell is gone?

The next trade needs the relocation work area handed over with the live drainage route and surface condition confirmed. Put the required check on the programme before the footing or paving crew arrives. Ask who records how any pipe left underground was taken out of service.

What should I ask about the old chamber position after removal?

Ask the provider to mark the old chamber position on the final soakwell relocation plan and describe how that area was left. Share the record with the next trade preparing the surface. If part of the old route remains underground, have its location and status recorded as well.

Request a free quote

Form preview · online enquiries are not open yet.